Liquid-applied waterproofing systems can provide a seamless and highly adaptable solution for flat roofs, balconies, walkways and complex roof details.

However, the performance of the finished system depends heavily on the surface beneath it. Even a high-quality waterproofing product may fail to bond or perform correctly if it is applied over a wet, contaminated, unstable or poorly prepared substrate.

Proper preparation is therefore not a minor stage of the project. It forms an essential part of the waterproofing system.


What Is the Substrate?


The substrate is the surface onto which the liquid waterproofing system is applied.

Depending on the project, this could include:

  • Concrete

  • Asphalt

  • Reinforced bituminous membrane

  • Timber or plywood

  • Cement boards

  • Metal

  • Existing liquid waterproofing

  • Tiles or screeds

  • Insulation-facing boards

  • A combination of different materials

Commercial roofs often contain several substrates within one area. The main roof may be formed from an existing membrane, while upstands, penetrations, plant supports and perimeter details introduce concrete, metal, timber or masonry.

Each material may require a different preparation method or primer.


Why Can’t Liquid Waterproofing Be Applied Directly Over Any Surface?


A liquid system needs a suitable surface to form a reliable bond.

If the substrate is loose, damp, dirty or contaminated, the waterproofing may only adhere to the material sitting on the surface rather than the roof itself.

For example, applying a coating over dust does not bond the waterproofing securely to the substrate. It bonds it to the dust, which can then detach.

Problems may also arise where the existing surface contains:

  • Standing water

  • Trapped moisture

  • Oil or grease

  • Moss or organic growth

  • Loose mineral finishes

  • Flaking coatings

  • Failed repairs

  • Incompatible sealants

  • Corrosion

  • Unstable or deteriorated materials

These conditions must be identified and addressed before the waterproofing is installed.


Orange roofing ad over aerial apartment blocks: Planning a Major Roofing Project? Request a Site Visit.

How Is the Existing Surface Assessed?


The assessment begins with an inspection of the existing roof or balcony.

The contractor may need to establish:

  • What the substrate is made from

  • Whether it is sound and securely fixed

  • Whether moisture is present

  • What previous coatings or repairs have been applied

  • Whether contamination is visible

  • Whether cracks or movement are present

  • How different materials connect

  • Whether water can drain correctly

  • Which details require reinforcement

  • Whether adhesion testing is needed

A visual inspection may not provide every answer. Core samples, moisture testing or local opening-up may be required where the existing roof build-up is uncertain.

The findings help determine whether a liquid-applied system is suitable and what preparation work must be included within the specification.


What Preparation Work May Be Required?


The precise preparation method depends on the substrate and the waterproofing manufacturer’s requirements.

Common preparation work can include:

  • Cleaning and drying the surface

  • Removing dirt, moss and loose material

  • Removing defective coatings or repairs

  • Grinding or mechanically preparing hard surfaces

  • Treating corroded metal

  • Repairing cracks and damaged areas

  • Replacing unstable boards or roof components

  • Removing incompatible sealants

  • Levelling irregular surfaces

  • Preparing joints and changes in material

  • Applying the specified primer

  • Completing adhesion tests

Preparation should be appropriate to the surface rather than relying on one method across the entire roof.


Why Is Moisture Such an Important Consideration?


Moisture can affect both adhesion and the long-term performance of the waterproofing.

A roof surface may appear dry while moisture remains within the existing membrane, insulation, screed or concrete beneath it. Applying a new system without understanding the moisture condition can trap water within the build-up.

This may contribute to:

  • Blistering

  • Loss of adhesion

  • Vapour pressure beneath the coating

  • Continued deterioration of insulation

  • Corrosion

  • Damage to the underlying deck

  • Water remaining within the roof after refurbishment

Some waterproofing products may tolerate particular moisture conditions, while others require a dry substrate. The relevant manufacturer’s requirements must be followed.

Where widespread moisture is found, isolated preparation may not be enough. The project team may need to reconsider whether the existing roof can be retained or overlaid.


Why Are Primers Used?


A primer helps prepare the substrate to receive the waterproofing system.

Different surfaces may require different primers. The product used for concrete may not be suitable for metal, timber or an existing membrane.

The correct primer can help:

  • Promote adhesion

  • Stabilise the prepared surface

  • Control absorption

  • Separate incompatible materials

  • Support a consistent application

  • Form part of the manufacturer-approved system

Applying the wrong primer, omitting it or covering it outside the required timeframe may affect the completed installation.

Manufacturers set their own requirements, which is why approved contractors must understand the complete system rather than treating the liquid coating as a standalone product.

PRC’s experience as a WestWood-approved roofing contractor includes installing liquid-applied waterproofing systems on complex commercial roofs.


What Is Adhesion Testing?


Adhesion testing can help establish whether the proposed system will bond effectively to the prepared substrate.

A small test area may be cleaned, prepared, primed and coated using the proposed products. Once cured, its adhesion can be assessed.

Testing may help identify:

  • Whether further preparation is needed

  • Whether the selected primer is suitable

  • Whether an existing coating should be removed

  • Whether contamination is affecting the surface

  • Whether a different waterproofing approach is required

A successful test in one location does not necessarily represent every part of a large roof. Where substrates or conditions vary, tests may be required in more than one area.


How Are Cracks and Joints Prepared?


Liquid waterproofing can accommodate complex shapes, but cracks and joints still need to be assessed properly.

Not every crack should simply be coated over.

The contractor must consider whether it is:

  • Stable or continuing to move

  • Limited to the surface or connected to the structure

  • Part of a designed movement joint

  • Caused by deterioration

  • Allowing water into the roof build-up

  • Suitable for reinforcement within the waterproofing system

Repairs and reinforcement should follow the specified system details. Movement joints may need to remain functional rather than being rigidly covered.


Why Do Details Need Additional Attention?


The main roof area is often relatively straightforward. The most demanding parts are usually the details.

These can include:

  • Upstands

  • Door thresholds

  • Outlets

  • Gutters

  • Rooflights

  • Pipe penetrations

  • Plant supports

  • Balustrade posts

  • Changes in level

  • Junctions between different materials

These areas may need local repairs, specialist primers, reinforcement or additional waterproofing layers.

At the Millstream West roof refurbishment, PRC installed a WestWood low-odour PMMA waterproofing system around extensive air-handling units, cabling, pipework and ducting. Careful preparation and detailing were essential within the congested plant area.


How Does Weather Affect Substrate Preparation?


Weather conditions can influence when preparation and application can take place.

Rain, condensation, frost, high humidity and temperature can affect the substrate or the way products cure. Wind may also carry dust and debris back onto a prepared surface.

The project team must consider:

  • Whether the substrate is sufficiently dry

  • Surface and air temperatures

  • Risk of rain

  • Condensation and dew

  • Product curing times

  • How long a prepared area can remain exposed

  • Whether temporary protection is required

Preparation completed too far in advance may need to be checked or repeated before the waterproofing is applied.


What Happens If Preparation Is Rushed?


Poor preparation may not always be obvious immediately after installation.

The roof can initially appear complete and watertight, but defects may develop once the system is exposed to weather, movement and temperature changes.

Possible consequences include:

  • Localised peeling

  • Blistering

  • Delamination

  • Cracking

  • Water tracking beneath the coating

  • Failure around details

  • Reduced system life

  • Difficulty obtaining manufacturer approval

  • Warranty disputes

Correcting these problems may require the affected system to be removed, the substrate prepared again and the waterproofing reinstated.

The time saved during rushed preparation can therefore lead to significantly greater disruption and cost later.


Does Every Liquid Waterproofing System Require the Same Preparation?


No. Liquid systems differ in their chemistry, application methods and substrate requirements.

A preparation method suitable for one product should not automatically be used for another.

The selected manufacturer may specify:

  • Approved substrates

  • Cleaning methods

  • Moisture limits

  • Required primers

  • Reinforcement

  • Application temperatures

  • Minimum curing times

  • Testing requirements

  • Restrictions around existing materials

This is why choosing the right system for a commercial roof refurbishment must take account of the existing roof condition as well as the desired finish.

As a Triflex-approved roofing contractor, PRC also works with manufacturer-specified liquid waterproofing systems for roofs, balconies, walkways and complex details.


Substrate Preparation on Overlay Projects


Liquid waterproofing is often considered for refurbishment projects because it may be possible to retain part of the existing roof.

This can reduce strip-out, waste and disruption, but an overlay is only suitable where the existing construction is capable of supporting the new system.

Before proceeding, the contractor may need to confirm:

  • Whether the existing covering is securely attached

  • Whether wet insulation is present

  • Whether defective areas can be removed locally

  • Whether the surface is compatible

  • Whether the drainage remains suitable

  • Whether the new build-up meets the required specification

  • Whether the manufacturer will approve the proposed application

At Buckley Court, the existing failing roof was stripped back to the concrete deck before a new Nimbus waterproofing system and tapered insulation were installed. This demonstrates why the condition of the existing construction must determine the refurbishment approach.


Why Manufacturer Requirements Matter


Where a manufacturer-backed system and warranty are required, substrate preparation may be inspected as part of the project.

The manufacturer may request photographs, test results or inspections at key stages. Once the waterproofing has been applied, much of the preparation work is no longer visible.

Keeping clear records can therefore be important, particularly on larger commercial and public-sector projects.

The contractor should also raise any difference between the surveyed condition and the actual substrate before continuing with the installation.


Planning a Liquid Waterproofing Project


Substrate preparation is one of the most important parts of any liquid waterproofing installation.

The surface must be assessed, cleaned, repaired and primed in accordance with the selected system. Complex details, moisture and changing substrates must also be addressed before the main waterproofing is applied.

Premier Roofing & Construction delivers commercial flat roofing and liquid waterproofing projects for commercial properties, housing associations, managing agents and public-sector buildings across London, Essex, Kent and the South East.


Orange roofing ad with aerial apartment rooftops; text says Planning a Major Roofing Project? and Request a Site Visit.

 
 
bottom of page