What Happens When Different Roofing Systems Meet on the Same Building?
Large and complex buildings rarely have just one type of roof.
A property may include a main pitched roof, flat roof extensions, balconies, walkways, canopies, plant areas and sections of leadwork. Each area might perform correctly on its own, but the points where different roofing systems meet can become some of the most vulnerable parts of the building.
Successfully refurbishing this type of roof requires more than selecting suitable materials. The junctions between the systems must be properly surveyed, designed and installed so that water can drain safely across the entire building.
Why Do Buildings Have Multiple Roofing Systems?
Different roofing systems are often used because buildings have been extended, altered or refurbished at different times.
A single property might contain:
Tiles or slates on the main pitched roof
Reinforced bituminous membrane on a flat roof
Liquid waterproofing around complex details
Leadwork around chimneys and parapets
Waterproofed balconies or walkways
Roof coverings surrounding plant equipment
Older materials retained alongside newer systems
These combinations are particularly common on schools, housing estates, commercial properties, public buildings and blocks of flats.
The challenge is not necessarily the number of systems involved. It is how effectively they connect and work together.
Why Are Roof Junctions More Vulnerable?
Every change in material, height, angle or roof construction creates a junction that must be carefully detailed.
Materials can expand and contract at different rates. Some systems are rigid, while others are designed to accommodate movement. Roofs may also drain in different directions or discharge water onto adjoining areas.
Problems can develop where:
A pitched roof drains onto a flat roof
A balcony connects with an internal floor
A waterproofing membrane meets brickwork
New materials are installed against older coverings
Leadwork connects tiles, masonry and flat roofing
Roof levels create restricted upstand heights
Plant supports or service penetrations interrupt the waterproofing
Water will often enter at one of these junctions and travel beneath the roof covering before becoming visible internally. This is why roof leaks are sometimes blamed on the wrong part of the building.
Where Pitched and Flat Roofs Meet
The junction between a pitched roof and a flat roof requires careful consideration.
Rainwater from the pitched area may be discharged directly onto the flat roof below. This means the flat roof must accommodate water from a much larger area than its own surface suggests.
The junction may require appropriate flashings, waterproofing upstands and drainage capacity. Tiles, underlays, battens and membranes must also be coordinated so that water cannot pass behind the flat roof covering.
If the flat roof is refurbished without assessing the pitched roof above it, the new system may not resolve the original leak.
Balconies, Walkways and Roof Areas
Balconies and communal walkways can also form part of the building’s waterproofing arrangement.
These areas may connect with flat roofs, external walls, door thresholds and internal accommodation. The available height between the waterproofing and the doorway can be limited, making the detailing particularly important.
Falls, outlets and surface finishes must work together. If tiles or decking are placed above the waterproofing, there must also be a suitable route for water to escape beneath them.
Our guide explaining why walkways can sometimes function as roofs looks more closely at this often-overlooked part of a building.
Roof-Mounted Plant and Services
Commercial roofs frequently contain air-conditioning units, ventilation systems, ducts, pipework, cable trays and other equipment.
These services may pass through more than one roof build-up or be supported by structures connected to the waterproofing. Each penetration or support creates another area that must be properly detailed.
Access for future maintenance must also be considered. Engineers may need to cross the roof regularly, increasing the risk of accidental damage.
This is explored further in Why Rooftop Plant Equipment Creates Roofing Challenges.
Can Different Roofing Materials Be Connected Directly?
Not always.
Different products may have incompatible chemical compositions, fixing requirements or movement characteristics. A suitable transition detail may be needed between them.
Before deciding how the systems should connect, the contractor or designer may need to establish:
What materials are already present
The condition of the existing roof coverings
Whether moisture is trapped within the roof
How each area is constructed
The direction and volume of rainwater flow
Whether the existing details comply with current requirements
Which manufacturer will approve the proposed junction
This is one reason why choosing a system for a commercial roof refurbishment should be based on the complete building rather than an isolated roof area.
Who Is Responsible for the Junction Between Systems?
Responsibility should be established before work begins.
On some projects, one roofing contractor installs all the systems. On others, different contractors or specialist trades may be involved. If responsibilities are unclear, each party may assume that someone else will complete the junction.
The specification should clearly identify:
Who prepares each roof area
Who installs the transition detail
Which system is installed first
How temporary waterproofing will be managed
Who inspects the completed junction
Which manufacturer’s warranty applies to each area
This is particularly important where the work includes roofing, cladding, windows, masonry or mechanical services.
Sequencing the Roofing Work
The order in which different systems are installed can affect the final result.
For example, leadwork may need to be installed before tiles are fixed. Roof penetrations may need to be completed before the final waterproofing layer is applied. One roof area may also need to remain operational while another is refurbished.
Poor sequencing can lead to finished waterproofing being disturbed, damaged or altered by other trades.
A clear programme should coordinate the different roofing systems and allow sufficient time for inspection before junctions are covered or made inaccessible.
What Happens When Hidden Conditions Are Discovered?
Drawings and visual surveys do not always reveal exactly how older roof systems connect beneath the surface.
Once coverings are removed, contractors may find:
Damaged or unsuitable structural decks
Wet insulation
Concealed outlets
Inadequate falls
Previous repairs beneath the covering
Missing cavity trays or flashings
Roof levels that differ from the drawings
Materials that cannot be connected as originally proposed
These discoveries do not automatically mean the survey or specification was inadequate. Some conditions can only be confirmed after the roof is opened.
The potential for hidden defects should therefore be considered within the programme and budget. Our article on why roofing projects often uncover additional problems once work begins explains this in more detail.
Warranties on Buildings With Multiple Roof Systems
A building containing several roof types may have more than one warranty.
Each manufacturer may only cover its own approved materials and installation. The junction between two systems must therefore be agreed carefully, particularly if it falls outside a standard detail.
Before work begins, clients should understand:
Which roof areas are included within each warranty
Whether the transition details have been approved
Whether inspections are required during installation
Who is responsible for adjoining materials
What maintenance is required after completion
A warranty should never be assumed to cover every part of a complex roof simply because one manufacturer’s product has been used.
Why a Whole-Building Approach Matters
Treating each roof area as a completely separate project can allow problems to remain at the boundaries between them.
A whole-building approach considers how the pitched roofs, flat roofs, balconies, walkways, drainage systems, walls and rooftop equipment interact.
This helps the project team identify where water is coming from, how it moves across the building and which details require the greatest attention.
It can also prevent a new roof system from being installed successfully while an adjoining defect continues to allow water into the property.
Planning a Complex Roof Refurbishment
Where different roofing systems meet, early investigation and coordination are essential.
The project may require input from roofing contractors, manufacturers, surveyors, structural engineers, scaffold designers and other specialist trades. Suitable access must also be planned because difficult roof areas can affect inspection, installation and future maintenance. Read more about why roof access can have a bigger impact on cost than roof size.
Premier Roofing & Construction delivers commercial roof repairs and refurbishment projects across London, Essex, Kent and the South East. Our team works with a range of roofing systems and manufacturers, allowing complex roof areas and their connecting details to be considered as part of one coordinated project.
If your building contains several roof types or has recurring leaks around roof junctions, contact PRC to arrange a site visit or request a quotation.