What Happens at the End of a Commercial Roofing Project?
Completing the installation of a new commercial roof is an important milestone, but it isn't necessarily the final step of the project.
Before a roofing project is fully handed back to the client, there may be inspections, snagging, documentation and warranty requirements to complete.
For building owners, managing agents, housing providers and public-sector organisations, understanding the handover process can help ensure important information about the new roofing system isn't lost once contractors leave site.
What Happens When the Roofing Works Are Complete?
Once the main roofing installation has been completed, the project will normally move towards inspection and handover.
The exact process depends on the size of the project, the contract arrangements, roofing system and whether a manufacturer-backed specification or warranty forms part of the works.
On a substantial commercial flat roofing project, completion may involve several stages rather than simply finishing the waterproofing and removing the workforce from site.
These can include:
Final inspections
Snagging
Completion of outstanding works
Manufacturer involvement where applicable
Site clearance
Handover documentation
Warranty or guarantee information
The requirements should reflect the individual project.
What Is Snagging on a Roofing Project?
Snagging is the process of identifying items that require attention before the works are considered fully complete.
A snag doesn't necessarily mean there is a serious defect with the roofing system.
It could relate to a relatively minor item that needs completing, adjusting or making good.
On larger commercial projects, snagging may involve the roofing contractor alongside the client's surveyor, consultant, contract administrator or other members of the project team.
Any identified items can then be addressed before final completion.
Is the Finished Roof Inspected?
Commercial roofing projects may involve different types of inspection.
The roofing contractor will have its own quality-control processes, while the client's representative may also inspect the completed works.
Where a manufacturer-backed roofing system is being installed, manufacturer inspections may form part of the project depending on the system and warranty arrangements.
The precise process varies between projects and manufacturers.
Manufacturer involvement doesn't replace the contractor's responsibility for the quality of its installation, but it can form another part of the overall project process.
What Happens if Something Is Identified During the Final Inspection?
If an issue is identified, it can normally be recorded as an outstanding item requiring attention.
This might involve a particular detail, an area requiring further work or something that needs to be completed before the project is formally handed over.
The contractor can then address the relevant items before they are reviewed again where required.
On a large roofing project, having a structured completion process helps ensure smaller outstanding items aren't overlooked simply because the majority of the roof is finished.
What Is Practical Completion?
On construction projects operating under a formal contract, practical completion is an important contractual stage.
Broadly, it is the point at which the works are considered sufficiently complete for the client to use the completed project as intended, subject to the terms of the particular contract.
The precise meaning and process will depend on the contract being used, so it shouldn't be treated as a universal roofing definition.
Where a contract administrator or consultant is involved, they may have responsibilities relating to certification of practical completion.
This is particularly relevant on larger commercial and public-sector roofing projects.
What Happens to the Scaffolding?
Scaffolding isn't necessarily removed the moment the main waterproofing is finished.
There may still be outstanding roofing, leadwork, brickwork or other associated items that require access.
The project team may also want certain inspections or snagging completed while safe access remains available.
Once the relevant works have been completed and the scaffold is no longer required, arrangements can be made for dismantling.
This is one reason scaffold programming needs to be coordinated with the wider roofing programme.
We've previously explained why scaffolding is often one of the largest costs on a roofing project, particularly on larger or more complicated buildings.
What Happens to Materials and Site Equipment?
As works reach completion, surplus materials, equipment and waste associated with the roofing project can be removed from the working areas.
Temporary site arrangements may also begin to be dismantled.
Exactly what this involves depends on the scale of the project.
A large refurbishment may have involved storage areas, welfare facilities, skips, access equipment and temporary protection that all need to be considered as the site is handed back.
What Documentation Might Be Provided at Handover?
The documentation provided will vary according to the project and contract requirements.
For substantial commercial roofing works, this may include information relating to:
The roofing system installed
Manufacturer documentation
Warranties or guarantees
Maintenance information
Relevant completion records
Product or system information
Project-specific documentation
Where Operations and Maintenance information is required, relevant roofing information may form part of the wider O&M documentation for the project.
The exact handover requirements should ideally be established before completion rather than trying to assemble everything retrospectively.
Why Is It Important to Keep Roofing Records?
Commercial buildings can change ownership, managing agents and facilities teams several times during the life of a roof.
Years after the project has finished, the people responsible for the building may have had no involvement in the original refurbishment.
Good records can help them establish what roofing system was installed and who manufactured it.
This can become particularly useful when future maintenance, alterations or additional building services are being considered.
Without this information, a future contractor may have to investigate the roof simply to establish what system is already present.
What Happens With the Roofing Warranty?
Where a warranty or guarantee forms part of the roofing project, the relevant documentation should be retained by the client.
The exact arrangements depend on the manufacturer, system, contractor and project.
Different forms of cover can relate to different parts of the works, so building owners should understand what documentation they have received and any conditions that apply.
What About Manufacturer Documentation?
Where a manufacturer-backed system has been installed, there may be manufacturer documentation associated with the completed roof.
The requirements vary between manufacturers.
PRC works with a range of established roofing manufacturers across commercial refurbishment and replacement projects.
Where manufacturer inspections or warranty processes apply, any relevant completion requirements should form part of the project handover process.
Should the Client Receive Photographs?
Photographic records can be useful on commercial roofing projects, particularly where elements of the finished construction will no longer be visible.
The extent of photographic reporting depends on the project requirements.
On larger contracts, progress photographs may also have been taken throughout the works, providing a record of different stages of the installation.
These can complement other project documentation and provide useful information for future reference.
What Happens on Occupied Buildings?
Completion can require additional coordination where the building has remained occupied throughout the roofing works.
Temporary access arrangements may need to be removed, areas reopened and residents or building users informed that particular phases of work are complete.
Housing blocks, schools and operational commercial buildings can therefore require a more managed handover than an empty construction site.
Our existing article on why occupied buildings need a different roofing approach explains some of the wider planning considerations involved.
Does the Roof Need Maintenance After Refurbishment?
A newly refurbished commercial roof should still be managed during its service life.
Roof outlets can become blocked, debris can accumulate and other contractors may later install equipment or services at roof level.
Regular inspection and appropriate maintenance can help identify issues before they develop into larger problems.
Any manufacturer or warranty-specific maintenance requirements should also be understood by the building owner or facilities team.
What if Other Contractors Need to Work on the Roof Later?
This is an important consideration that can easily be forgotten after handover.
Commercial roofs are often used to accommodate plant, ventilation equipment, communications equipment and other services.
Future contractors may therefore need access to the roof.
If they alter, penetrate or damage the waterproofing system, this could create problems and may potentially have implications for applicable warranty arrangements.
Building owners should retain the roofing information so future works can be planned around the installed system rather than allowing alterations to be made without considering the roof.
Our live article why rooftop plant equipment creates roofing challenges explains why coordination between roofing and building services can be so important.
What Is the Defects Period?
Some commercial roofing projects carried out under formal construction contracts may include a defined period following practical completion during which defects are dealt with in accordance with the contract.
The terminology and procedure depend on the particular contract.
This is separate from assuming that every roofing project automatically has the same defects period or process.
For clients procuring larger works, the contractual arrangements should establish how post-completion items are managed.
Handover Should Be Planned Before the End of the Job
Good project handover doesn't begin on the final day.
Documentation requirements, warranty processes, inspections and client information can be considered throughout the project.
This makes it easier to bring everything together when the physical roofing works reach completion.
It can also reduce delays caused by missing information or outstanding requirements.
The End of the Roofing Works Is the Start of the Roof's Service Life
A commercial roof refurbishment may be designed to provide many years of service.
The completion process therefore has a longer-term purpose.
It establishes what has been installed, records relevant information and provides the building owner with documentation that may be needed in the future.
For managing agents, housing providers and facilities teams responsible for large property portfolios, retaining this information can make future roof management considerably easier.
Commercial Roofing Projects Across London, Essex and Kent
Premier Roofing & Construction undertakes commercial roof refurbishment and replacement projects across London, Essex, Kent and the wider South East.
We work across commercial, public-sector and multi-residential properties, installing built-up felt, single-ply and cold-applied liquid waterproofing systems from established manufacturers.
From project planning through to completion and handover, the requirements of each roofing project are managed according to the building, specification and scope of works.
.png)